Okay guys - I figured I'd do a "where things are" post. Just in case some have lost track of what stage I'm at and how long of a road I've got to go. Hell, there's so many awesome projects on these boards, most of the time I'd rather watch everyone else work on their trucks than update my own build thread. But - here it goes.
The front half of the truck is painted and home, slowly being assembled. The details of putting together the details have REALLY slowed me down. If I was building a stock truck, it would be finished by now. But all the little decisions I've made to "make it mine" have slowed the project considerably. Not that I regret those decisions, but sometimes I just have to remind myself that the goal is to finish and drive this truck, not just tinker with the damn build!
- Sound deadener on the floor, firewall, ceiling, inside both doors, behind fuel tank
- Carpet installed
- Painted steering column assembled and installed (may need to come back out - more later)
- New firewall cover installed
- Vintage Air Mini Gen II Air/Heat/Defrost evaporator installed
- Custom designed, built, and installed wire harness.
- Windshield installed
- Ranger dash trim installed
- Gas and brake pedals in
- Custom vent boxes installed
- Door weatherstripping finished
- Vent window assemblies were dissassembled, powdercoated, and installed with all new seals.
- New door handles and locks installed
- Door latches were cleaned and reinstalled
- New dash speaker assembly is complete - yet to be installed
- Adapter plate for A/C controls is complete - waiting on bezel to be chromed before final install.
- Custom designed (by me) Instrument panel has been machined and test fit - deciding on final finish/color before final install.
And here's some photo's to go along with the above; (several more on previous pages obviously)